LPG Refrigerated Storage Project – PVGAS (2012)

  • Fabrication & Erection of steel support, cable tray
  • Installation of JB, field instrument, F & G, DCS, CCR
  • Installation of Power transformer, MV Switchgear, MCC, AC UPS/ Batteries, LCS, Bus way IP68
  • Cable pulling, glanding, termination and testing cable
  • Loop check and Commissioning